‹ BackHN Continuity

Thread

Getting the most out of Opus 5.5 in Claude and Claude Code

232 points · 156 comments · saikatsg

  1. rdli · · focus · HN ↗
    It’s a really good model. Over the past few days, I give Opus some general directives to basically speed up our CI, and telling it I care both about billing minutes and wall clock time. I told it to create a plan after analyzing everything in our CI, run the plan by a Fable subagent, and then focus on low-risk, high-reward changes.

    9 hours later, I had 12 PRs ready to be merged, and the net result is CI time has dropped from ~10 minutes to ~4 minutes, and billing minutes have dropped around 60%. Less than an hour of my attention.

    1. tamimio · · focus · HN ↗
      It’s great, but you still need to know what you are doing, not just the goal/s. I built a platform years ago from scratch, and now I am remaking it with more features and more polished design, I know exactly what needs to be done to tiniest details. The first prompt was very well detailed about the architecture and how everything should work, after an hour work at Xhigh, it did create the blueprint artifacts that I asked for, then I spent 3 days reading every single thing and writing notes, turned out it made the system overly complicated without adding extra value, plus I can see how some of the architecture design will be potentially a security risk. So after few days I fed my notes, this time took 4hours and 1M tokens! Later I spent more few days reviewing and writing notes, it was closer to what I want but still made architecture errors, the third run took around an hour and finally made it how it supposed to be, although there are still more notes on non critical stuff. So I don’t think we are yet at the stage where sitting goals and some high level is enough to produce quality results.
Open on Hacker News to reply ↗

Unofficial Hacker News client; not affiliated with Y Combinator.