NRC issues first U.S. construction permit for a BWRX-300 small modular reactor
Thread
Unofficial Hacker News client; not affiliated with Y Combinator.
NRC issues first U.S. construction permit for a BWRX-300 small modular reactor
Unofficial Hacker News client; not affiliated with Y Combinator.
preisschild · · focus · HN ↗
nine_k · · focus · HN ↗
jillesvangurp · · focus · HN ↗
This particular reactor is already estimated at over 5 billion $ I think. That's a lot of money for just 300MW and it probably could end up being a wildly optimistic estimate as well. I think effectively much of the construction is still on site and not in a factory. Hence the need for a construction permit. So, you get all of the downsides of complex on site construction such as including high cost, permitting overhead, lots of bureaucracy, associated delays & uncertainty, etc. without the upside of actually delivering a lot of power like you would with a larger reaction. Calling it "modular" might be overstating things a bit.
Probably cheaper, faster, and easier to just plonk down 5GW of solar, wind, or battery (or combinations of those). Especially if you calculate in the 200-300% time and dollar budget that many nuclear projects seem to end up having. Maybe this one will be different. A lot of people have a lot riding on Nuclear projects breaking this trend. But then that has been the case for decades.
xvilka · · focus · HN ↗
throwaway2037 · · focus · HN ↗
Related: UAE had zero nuclear power plants before the Barakah nuclear power plant[1] opened starting in 2020. They built 4x Korean APR-1400s for only 32B USD. That seems incredibly cheap. How did they do it? I assume (near) slave labour prices for construction workers, like most other stuff built in that country.
[1] <a href="https://en.wikipedia.org/wiki/Barakah_nuclear_power_plant" rel="nofollow">https://en.wikipedia.org/wiki/Barakah_nuclear_power_plant
ZeroGravitas · · focus · HN ↗
Higher lending rates can easily double the final cost and they multiply with any time delays.
That particular build had government finance from both the host and the building government.
throwaway2037 · · focus · HN ↗
ZeroGravitas · · focus · HN ↗
No, I'm answering your question as to why their build costs are surprisingly low. They didn't finance at the rate that other builds did and finance related costs can be 2/3rds of the total cost of a nuclear plant.
throwaway2037 · · focus · HN ↗
ZeroGravitas · · focus · HN ↗
> Compare the expected cost of a nuclear plant at 0% and 10% WACC
The IEA has published a few cost analysis that show numbers for 3,7 and 10%
Here's a pro nuclear source with a nice graph about half way down:
<a href="https://world-nuclear.org/information-library/economic-aspects/financing-nuclear-energy" rel="nofollow">https://world-nuclear.org/information-library/economic-aspec...
It also explains that the buildout in the 70s in the west had guaranteed government finance.
chermi · · focus · HN ↗
throwaway2037 · · focus · HN ↗