NRC issues first U.S. construction permit for a BWRX-300 small modular reactor

151 points · 191 comments · papa-whisky

  1. throwaway2037 · · focus · HN ↗
    First, the Wiki page[1] for this reactor design has so little technical information. Frankly, it is a disappointing. For example, no where on the page does it explain that "300" means 300MW nameplate capacity. I had to Google for that info.

    The canary in the coal mine is already happening in Canada.

    From Wiki: <a href="https:&#x2F;&#x2F;en.wikipedia.org&#x2F;wiki&#x2F;BWRX-300#Canada" rel="nofollow">https:&#x2F;&#x2F;en.wikipedia.org&#x2F;wiki&#x2F;BWRX-300#Canada

        &gt; On December 1, 2021, Ontario Power Generation (OPG) selected the BWRX-300 SMR for use at the Darlington Nuclear Generating Station.  The final investment decision in May 2025 to proceed with the build of a BWRX-300 was based on a forecast cost of Canadian $7.7 billion (US$5.6 billion), with an estimated cost of Canadian $13.2 billion (US$9.6 billion) for the three further units on the same site.
    
    Yikes. Estimated cost of 15.2B USD for 1200MW of capacity. I am taking bets: How much will this project overrun its estimates? My guess: 25-50%. I don&#x27;t get it. Why are these better than just building one big reactor with 1000MW+ of capacity?

    Also, it looks like Darlington Nuclear Generating Station originally planned to build 4x 1200MV Advanced CANDU reactors. These were cancelled and replaced with a plan to build 4x BWRX-300 reactors.

    [1] <a href="https:&#x2F;&#x2F;en.wikipedia.org&#x2F;wiki&#x2F;BWRX-300" rel="nofollow">https:&#x2F;&#x2F;en.wikipedia.org&#x2F;wiki&#x2F;BWRX-300

    1. 486sx33 · · focus · HN ↗

      [dead]

Open on Hacker News to reply ↗