NRC issues first U.S. construction permit for a BWRX-300 small modular reactor
Thread
Unofficial Hacker News client; not affiliated with Y Combinator.
NRC issues first U.S. construction permit for a BWRX-300 small modular reactor
Unofficial Hacker News client; not affiliated with Y Combinator.
preisschild · · focus · HN ↗
nine_k · · focus · HN ↗
jillesvangurp · · focus · HN ↗
This particular reactor is already estimated at over 5 billion $ I think. That's a lot of money for just 300MW and it probably could end up being a wildly optimistic estimate as well. I think effectively much of the construction is still on site and not in a factory. Hence the need for a construction permit. So, you get all of the downsides of complex on site construction such as including high cost, permitting overhead, lots of bureaucracy, associated delays & uncertainty, etc. without the upside of actually delivering a lot of power like you would with a larger reaction. Calling it "modular" might be overstating things a bit.
Probably cheaper, faster, and easier to just plonk down 5GW of solar, wind, or battery (or combinations of those). Especially if you calculate in the 200-300% time and dollar budget that many nuclear projects seem to end up having. Maybe this one will be different. A lot of people have a lot riding on Nuclear projects breaking this trend. But then that has been the case for decades.
coldpie · · focus · HN ↗
pfdietz · · focus · HN ↗
mixdup · · focus · HN ↗
But, the $5 billion here isn't purely an investment in 300 MW of capacity, it's an investment in starting up the nuclear reactor factory that can start churning these things out at $1-2 billion or whatever their goal may be
Also, have to take into consideration the overall operating costs. Nuclear costs significantly more up front but over time costs much less to operate (and is much more predictable) because you don't have to buy and burn natural gas forever
dalyons · · focus · HN ↗
The only cheap nuclear watts come from facilities built a long time ago in a completely different cost environment, and had construction and insurance subsidized by the state.
mixdup · · focus · HN ↗
pfdietz · · focus · HN ↗
mixdup · · focus · HN ↗
pfdietz · · focus · HN ↗
mixdup · · focus · HN ↗
A standardized reactor design that doesn't need a bespoke training control room at every single site means fewer training staff. It means the same maintenance workers and compliance workers and everyone else can be utilized more because they can cover more facilities instead of just the single site they are certified on and work at