Plan mode is dead

591 points · 510 comments · jmvldz

  1. SillyUsername · · focus · HN ↗
    I'm going through the same problem right now

    Qwen 3.8 27b is the supervisor

    Qwen 3.5 4b are the 6-15 minions it controls

    Gemma 4 e4b is the validator for the supervisor.

    A plan means it preps all work for the agents up front, tests that evals work, makes sure the dev environment is right for each agent, then finds and fixes each before the distributed tasks even begin.

    What I thought would take minutes took hours as a supervisor or one agent did the prep / pre flight work.

    My solution so far has been to drop all but basic setup and force the supervisor to ask before every op - if this is not the design choices, can this be run in parallel? If so, hand it off NOW.

    I'm still iterating this workflow, but less setup for all the minions plus handing them work that may be incomplete/ broken is caught and fixed by the minion and its own qa gates.

    This can mean a number of minions end up replicating the same fixes, but in general the time cost of that is small Vs the supervisor working in parallel instead of too sequentially.

    1. adastra22 · · focus · HN ↗
      Tell the planner to not do all that. Just plan out the high level. No code. No implementation details.
      1. tcdent · · focus · HN ↗
        Yeah, it's way better when you do design documentation, or even ticketing, to instruct it not to include any implementation specifics. You're not doing the deep dive on the zero shot that writes the ticket or the document and so it is much less informed than the agent doing the work will be.