The only valid argument against data centers in space is the economic cost. If the per megatoken price for space datacenters is higher than terrestrial, then this won't work.
But the price for terrestrial datacenters keeps going up and technology keeps dropping the price of space-based.
0cf8612b2e1e · · focus · HN ↗
If you are trying to generate a profit, every extra kg puts you further in the red. It still costs over $1000/kg of mass to get into orbit.
GMoromisato · · focus · HN ↗
But if it's an economic argument, then you need to do the actual math. How big is the radiator? How low could the price to orbit go? How much can you charge per million tokens in 2030?
The reason this is a fake argument is because the validity depends on the math, and nobody advancing the "you can't cool stuff in space" argument is actually doing the math.
sobellian · · focus · HN ↗
If you want math then <a href="https://andrewmccalip.com/space-datacenters" rel="nofollow">https://andrewmccalip.com/space-datacenters exists. The numbers are grim for orbital DC. Even if you drag the launch cost slider all the way to $1/kg (by the way this is literally sci-fi, per ChatGPT air freight of semiconductors from Taiwan to Ohio costs $9/kg and ocean/train freight costs a bit under $1/kg for a reasonable shipment so good luck with $1/kg to LEO this century) it is still more than twice as expensive as terrestrial DCs.
GMoromisato · · focus · HN ↗
That sounds absolutely possible. But in any event, we're now arguing a different thing.
The only thing I'm arguing is that cooling is a solved problem. I don't know if SpaceX will ever get the price down so that it is economical. But I'm convinced that there is no universe in which they hit their foreheads and say, "Oh no, we forgot about cooling!"
sobellian · · focus · HN ↗
> No additional mass for liquid cooling loop infrastructure; likely needed but not included
> Thermal: only solar array area used as radiator; no dedicated radiator mass assumed
In hardware and mfg. solvable vs. solved is a big difference. And I too believe that SpaceX's engineers know about radiator panels. But the more cynical interpretation is that whatever the SpaceX engineers think about the technical merits, they are not being asked for that. They are just being asked for a pretext that justifies the xAI acquisition. Elon is also discussing lunar satellite factories that launch the satellites via railgun. Now, is this physically impossible? No, that isn't physically impossible either and I will seriously defend the physical possibility of this. It's not going to happen though.
And you could spend all the engineering costs on building some seriously efficient terrestrial DCs, but somehow all these analyses start with "assume that launch and satellite technology advances manyfold and terrestrial DCs stagnate or become less efficient, then if you squint the two numbers get kinda close."
Ajedi32 · · focus · HN ↗
sobellian · · focus · HN ↗
This is why that calculator, even under extremely optimistic assumptions for orbital, and even if you assume launch is zero, still cannot make it competitive with terrestrial.
Ajedi32 · · focus · HN ↗
sobellian · · focus · HN ↗
Ajedi32 · · focus · HN ↗
> If you assume Starlink satellite $/W
Why would you assume that, given that high power output is not a design goal of Starlink?
sobellian · · focus · HN ↗
Ajedi32 · · focus · HN ↗
Anyway, my point is that Starlink is not primarily designed to harvest as much solar power as possible the way data center sats are. I'm sure they're not making it inefficient on purpose, but what you're suggesting is like using the cost/W of a solar powered traffic camera to estimate the cost/W of a solar farm.
sobellian · · focus · HN ↗
Ajedi32 · · focus · HN ↗
sobellian · · focus · HN ↗
Ajedi32 · · focus · HN ↗
Cost is a different matter of course, but it seems incongruous to me that after being confronted with the fact that your power density assumptions were off by a factor of 2x you would continue to insist ChatGPT's weird assumptions about costs scaling linearly with mass are accurate. As was already pointed up up thread, even if all your calculator's assumptions are correct they can still turn a profit if they get the per satellite cost below $2 million.
sobellian · · focus · HN ↗