Italian parliament votes for return to nuclear energy

908 points · 818 comments · geox

  1. jacquesm · · focus · HN ↗
    I've seen quite a few SMR proposals over the last couple of years and not a single one that dared to address the whole cycle from deployment to eventual decommission as a function of the total revenues - costs to operate. Most of these projects seem to be made to bilk investors or governments rather than to actually produce power. The day Italy produces the first KWh that is net profitable to the operators without counting subsidies I will be highly amazed, and that's assuming they get to operational in the first place.
    1. asmodeuslucifer · · focus · HN ↗
      I agree, I tell everyone who will listen that no country, not Russia, China, Japan, France, USA etc has ever made nuclear power profitable. And you can't blame it on the environmentalists in China and Russia.

      That being said, many countries consider it a national security issue not to be held hostage to foreign oil.

      1. stymaar · · focus · HN ↗
        > country, not Russia, China, Japan, France, USA

        Are you serious when putting France in this list? Nuclear is such a cash cow here that EDF manage to make profits even while being forced by the regulator to sell a big fraction of its nuclear capacity below the operating cost and buying it back to them at market price! (We're talking about a multi-billon subsidies scheme, look for ARENH).

        And that is despite (rather legitimate IMHO) regulatory constraints that have no equivalent in any other industry.

        1. vjvjvjvjghv · · focus · HN ↗
          France doesn't have an answer for decommissioning costs.
          1. rightnutwingjob · · focus · HN ↗
            What are these decommissioning costs?

            The reactor vessel and the primary coolant loop.

            All that steel can be vitrified and stored in stainless casks somewhere fairly indefinitely.

            Or just buried. It doesn’t stay reactive very long.

            The rest of the site is no different to any other electricity generator, and no different really to the average industrial manufacturing plant.

            Everyone likes to just say ”decommissioning costs”, without actually thinking about what any of that means.

            It’s not like every nuclear power site is a Chernobyl.

            1. rich_sasha · · focus · HN ↗
              I remember reading about coal-fired power plants specifically in Poland, which exceed the radioactivity levels for nuclear plants. This because the burnt-off coal contains small amounts of radioactive elements, which form particles and drop off near the flue.

              But of course there are no norms for max radioactivity levels at a coal power plant site.

              1. teamonkey · · focus · HN ↗
                Coal plants spread radioactivity because it concentrates all the radioactive elements naturally found in the coal into ash, much of which then gets released into the air, deposited on surfaces and breathed in, which is extremely harmful.

                But if decommissioned properly, most of the ash inside the building can be collected and mixed into soil and bricks at a safe concentration not far above background radiation level.

                In a nuclear power plant, there is no release of radioactive materials, but it’s possible for the structure of the reactor and building to absorb radiation and become radioactive themselves, and that’s much harder to deal with.

Open on Hacker News to reply ↗