‹ BackHN Continuity

Thread

Telstra outage: The night a network decided the year was 2006

93 points · 34 comments · TMWNN

  1. vesinisa · · focus · HN ↗
    Is it really so that Time Division Multiplex timing in cellular networks is based on NTP time? I stopped reading after the article implied this - it doesn't sound plausible at all.
    1. kcexn · · focus · HN ↗
      No. The official report seems to suggest that software in IMS core (the subsystem that controls VOIP signalling in the mobile network) bugged out after the time was shifted back 20 years. That doesn't narrow down the specific failure that stopped calls from going through very much. IMS core is full of timers, but it could also have been a license server issue for all the report said about it.
      1. SulphurCrested · · focus · HN ↗
        I haven’t read the report, but I did read at the time that it was a certificate validation failure: clients thought the current time was before the "Not Valid Before" date. I forget now what essential service became unavailable because it was disbelieved.

        (Source would either have been the Whirlpool forums – where Australian ISP and telco engineers can be found – or local Australian mass media.)

        1. kcexn · · focus · HN ↗
          That's also plausible.
        2. vesinisa · · focus · HN ↗
          This the most common failure mode I have seen with clocks being widely out of sync. You can't access many online services as the certificates are either dated to future or expired.
Open on Hacker News to reply ↗

Unofficial Hacker News client; not affiliated with Y Combinator.